久久偷拍视频,玖玖精品视频,亚洲色婷婷综合久久久久中文,97超碰大香蕉,亚洲精品久久久久久久久久久久久,中文字幕色站,亚洲?国产?另类?无码?日韩麻豆,亚洲高清在线观看

當前位置: 首頁 > 新聞資訊 > 公司新聞 正文

鋼筋網(wǎng)交叉點一定要滿扎嗎?

添加時間:2020-05-23      發(fā)布人:http://www.zhuangpian.cn

在現(xiàn)場施工過程中經(jīng)常會遇到鋼筋網(wǎng)片交叉點沒有全部用扎絲綁扎,大部分是間隔綁扎。也許你可能會認為,鋼筋工為了剩工錢以及扎絲材料錢,而存在的“偷工減料”,但是你是否還發(fā)現(xiàn)有些部位不用咱們?nèi)ケO(jiān)管工人,工人都規(guī)規(guī)矩矩滿扎,知道這是為什么嗎!下面就來說說。
In the field construction process, it is often encountered that the intersections of steel mesh are not all bound with binding wire, most of them are bound at intervals. You may think that there is "Jerry building" in order to save money for steel workers and wire binding materials, but do you still find that some parts don't need us to supervise the workers, and the workers are well behaved? Do you know why! Let's talk about it.
現(xiàn)場施工,不論甲方、施工單位、監(jiān)理等,所有質(zhì)量問題,特別是鋼筋上面的,我們都會拿依據(jù)來說話,依據(jù)從何而來,圖紙、圖集、規(guī)范以及編制通過的施工方案。當然各個項目的圖紙和施工方案是不一樣的,不可同日而語。今天就主要說說大部分地區(qū)都通用的《建筑施工手冊》和《混凝土結(jié)構(gòu)工程施工規(guī)范》中關于鋼筋網(wǎng)交叉點是否要滿扎來說說。
For site construction, no matter Party A, the construction company, the supervisor, etc., all quality problems, especially those on the reinforcement, we will take the basis to talk about, according to where, drawings, Atlas, national specifications and the construction scheme prepared and passed. Of course, the drawings and construction plans of each project are different, not the same. Today, I will mainly talk about whether the intersection of steel mesh should be full in the building construction manual and code for construction of concrete structure engineering, which are commonly used in most areas.
一、建筑施工手冊
1、 Construction Manual
(1)、《建筑施工手冊》第四篇、第四節(jié)中關于鋼筋綁扎規(guī)定內(nèi)容如下:
(1) The provisions on steel bar binding in Chapter IV and Section IV of building construction manual are as follows:
①、鋼筋的交點須用鐵絲扎牢。
① . the intersection point of the reinforcement shall be firmly fixed with iron wire.
②、板和墻的鋼筋網(wǎng)片,除靠外圍兩行鋼筋的相交點全部扎牢外,中間部分的相交點可相隔交錯扎牢,但要保證受力鋼筋不發(fā)生位移。雙向受力的鋼筋網(wǎng)片,須全部扎牢。
② Except that the intersection points of two lines of steel bars on the periphery are all fastened, the intersection points of the middle part can be staggered and fastened, but the stressed steel bars shall not be displaced. The two-way stressed steel mesh shall be firmly fastened.
(2)、《建筑施工手冊》第二十一篇、第四節(jié)中關于鋼筋綁扎規(guī)定內(nèi)容如下:除柱鋼筋和梁鋼筋中的主筋采用焊接接頭外,其余受力筋和箍筋均采用綁扎連接。鋼筋綁扎采用現(xiàn)場綁扎,用20號鐵絲。柱、梁箍筋與受力鋼筋垂直設置,箍筋彎鉤疊合處,應沿受力鋼筋方向錯開設置。板及整澆層的鋼筋網(wǎng)外圍兩行鋼筋交點應每點綁扎牢固,中間部分的相交點可相隔交錯扎牢,但要保證受力鋼筋不致產(chǎn)生位移。總之,綁扎時要做到:鋼筋位置準確,綁扎牢固,鋼筋接頭位置,搭接長度,保護層厚度等符合要求,并嚴格按圖施工。
(2) In the 21st and 4th sections of the building construction manual, the provisions on steel bar binding are as follows: except that the main steel bars in the column steel bars and beam steel bars are welded joints, the rest of the stressed steel bars and stirrups are bound and connected. The reinforcement shall be bound on site with No. 20 iron wire. The column and beam stirrups shall be set vertically with the stressed steel bars, and the stirrup hook overlap shall be staggered along the direction of the stressed steel bars. The intersection points of two lines of reinforcement around the slab and the whole casting layer shall be bound firmly at each point, and the intersection points of the middle part can be staggered and fastened, but the stressed reinforcement shall not be displaced. In a word, when binding, it is necessary to ensure that the position of the reinforcement is accurate, the binding is firm, the position of the reinforcement joint, the overlapping length, the thickness of the protective layer, etc. meet the requirements, and the construction shall be carried out in strict accordance with the drawings.
濟南鋼筋批發(fā)
二、混凝土結(jié)構(gòu)工程施工規(guī)范
2、 Code for construction of concrete structure engineering
混凝土結(jié)構(gòu)施工規(guī)范底5.4.9中規(guī)定如下:鋼筋綁扎的細部構(gòu)造應符合下列規(guī)定:
5.4.9 of the code for construction of concrete structures stipulates as follows: the detailed structure of steel bar binding shall meet the following requirements:
①、鋼筋的綁扎搭接接頭應在接頭和兩端用鐵絲扎牢;
① . the binding lap joint of reinforcement shall be firmly bound with iron wire at the center and both ends of the joint;
②、墻、柱、梁鋼筋骨架中各垂直面鋼筋網(wǎng)交叉點應全部扎牢;板上部鋼筋
② The intersection points of the reinforcing mesh on each vertical plane in the reinforcement skeleton of the wall, column and beam shall be firmly fastened; the upper reinforcement of the slab
網(wǎng)的交叉點應全部扎牢,底部鋼筋網(wǎng)除邊緣部分外可間隔交錯扎牢;
All intersections of the mesh shall be firmly fastened, and the bottom reinforcement mesh can be staggered and fastened at intervals except for the edge part;
綜上所述個人覺得只有板底部鋼筋鋼筋存在間隔交錯綁扎(且是單向板),剪力墻墻的鋼筋網(wǎng)片是雙向受力,因此剪力墻墻筋也應滿扎。其余部位都不可以。
To sum up, I think that only the reinforcement at the bottom of the slab is alternately bound (and it is a one-way slab), and the reinforcement mesh of the shear wall wall is under two-way stress, so the shear wall reinforcement should also be fully bound. No other parts.
以上就是關于“鋼筋網(wǎng)交叉點要不要扎滿”的相關內(nèi)容,想了解更多歡迎點擊濟南鋼筋批發(fā)官網(wǎng)http://www.zhuangpian.cn/
The above is about "whether the intersection of steel mesh should be covered up". For more information, please click Jinan Steel wholesale website http://www.zhuangpian.cn/

上一條: 濟南鋼筋網(wǎng)有哪些優(yōu)勢呢?
下一條: 選購鋼筋網(wǎng)片要注意哪些問題?
咨詢熱線: 13605413762
龙川县| 九龙城区| 天台县| 江孜县| 阜宁县| 普定县| 永寿县| 云安县| 房产| 广西| 松滋市| 瑞昌市| 大荔县| 玉溪市| 贺州市| 台中市| 谷城县| 泗洪县| 济宁市| 申扎县| 化隆| 荆州市| 宝清县| 凯里市| 襄汾县| 商水县| 合水县| 任丘市| 滨州市| 疏勒县| 定州市| 边坝县| 老河口市| 犍为县| 屏边| 汉阴县| 崇阳县| 拉孜县| 大足县| 高阳县| 衡水市|